We can provide all kinds of subsations and transformers according to your requirement or drawings
The Advanced GGD Substation Switchgear embodies the pinnacle of engineering excellence, seamlessly optimizing the power distribution networks across power plants, substations, and industrial sectors. Serving as an indispensable cornerstone in power, lighting, and AC distribution systems, it operates at a standard frequency of 50Hz with a rated working voltage of 380V, and it deftly handles considerable rated currents up to an impressive 3150A. Renowned for its exceptional breaking capacity, this switchgear masterfully withstands a rated short-time current surge reaching an astonishing 50kA. This adaptable equipment is celebrated for its diverse circuit configurations, ease of assembly, and unparalleled practical utility, all encapsulated in an innovative design. Nationally acclaimed as the premier choice for assembled, fixed-panel switchgear, it stands as a testament to superior quality and unwavering reliability.
Our product is meticulously crafted with precision, adhering strictly to esteemed standards such as GB7251 'Low-Voltage Switchgear and Controlgear Assemblies' and IEC439 'Low-Voltage Switchgear and Controlgear Assemblies.' This unwavering compliance not only ensures rigorous adherence but also elevates our product offerings to a benchmark of unrivaled excellence within the industry.

Installation Instructions
Production Process
Packaging & Shipping

FAQ
Q:what's your major products?
A: Oil immersed and dry type transformer, transformer substation, high and low voltage switchgear and other custmization electrical equipment.
Q:Can I place the custom-made order?
A:Considering differences in voltage, frequency and other special transformer product in different countries and regions, our product can be customized according to your requirements.
Q:Are you a factory or trading company?
A:We are the factory with the first-hand price and the quality can be guaranteed.
Q:Is sample order acceptable?
A:Of course,sample order is the best way to build trust.
Q:How about the delivery time?
A:Usually it takes about 15-20 days.The specific situation will be based on the design drawings.
Q:What's your term of payment,
A:We require a 30% T/T advance, with the remaining 70% due before shipment. Additionally, L/C is welcome options.